Jersey Pasteurizadora - Variadores
Aplicacion de variadores de frecuencia en bombeo de alimentacion de agua. Aplicacion PID con sensor de presión para mantener una presion estable en el proceso.
View project
Jersey Pasterurizadora - Iluminación
Reemplazo de luminarios y automatización del alumbrado con sensores de presencia. Reducción del consumo energético en porcentaje - 65
View project
Jersey Past. - Controlador Compresores
Integracion de controlador SAM para cuarto de compresores. Reducción de energia del 26 porciento.
View projectJersey FNE - Variadores
Aplicacion de variadores a velocidad constante y variacion en torque. Alcanzando un ahorro del 60.
View projectPower Sonic - Cooling tower Installation
Inlcude the complete installation and also the integration of variable frecuency drives and pressures sensors to control the pumps motors.
View project
Power Sonic - Compressors system
Compressor system improvement project. Includes compressor substitution. Air dryers and filters. Aluminum piping and air blowers.
View projectPower Sonic - Air conditioning replacement
Air conditioning equipment was replaced to both create a possitive pressure and reduce the used Kwh. Also an ilumination project was performed to improve the lighting levels and reduce consumed energy. chieved savings was 20 percent on AC and 60 on Lighting.
View projectHarman Audio - Plant ilumination improvement
Inlcudes the replacement of lamps maintaining the lighting levels and reducing about 70 percent of the used Kwh.
View projectNypro Health Care - Wh. Ilumination
The wharehouse lighting was improved by replacing the current lamps for a newer generation. Also presence sensors were installed on all areas to assure the lamps are off when nobody is present in the area. Achieved savings 60 percent.
View project
Prime Wheel - Power Factor Project
Power factor is being improved from an average of 86 percent to 98 percent.
View project